Our 2022 AGM is being held on…

Monday, 7 November 2022 starting at 6:00 pm – City Hall, College Green, Bristol

Our Agenda

  1. Introduction from Chair, Mark Ashdown
  2. Finding our remarkable UK & Irish urban trees – Paul Wood
  3. Panel Discussion between Paul Wood and Andy Bryce
  4. Our Tree Champions
  5. Bristol’s emerging local plan
  6. Election of officers and financial report
  7. AOB

We are looking forward to seeing you there.

Paul Wood

Paul is the author of three books: London’s Street Trees: A Field Guide to the Urban Forest; London is a Forest; London Tree Walks: Arboreal Ambles Around the Green Metropolis and is the editor of the Great Trees of London map. He has a lifelong passion for nature, especially trees, and was formerly a trustee of the London Wildlife Trust. He is currently working on a book about 1,000 remarkable urban trees throughout the UK and Ireland, to be published by Penguin in 2023.

Paul regularly leads walks and gives talks about trees in urban areas. As well as London, Paul has led walking tours around the streets of Bath, Sheffield, Dublin and even Philadelphia.

Andy Bryce

Andy is the Trees and Woodlands Manager at Bristol City Council. He manages Bristol’s team of tree officers and is responsible for managing our existing tree stock. Andy joined BCC in November 2021 having previously worked as an arborist at The National Arboretum, Westonbirt, latterly as its Collections Manager.  Andy has worked in arboriculture for over 20 years, six of which were as an arborist in Bristol.  Andy’s current research interest is tree pests and diseases.

Trees for Streets – will we see more trees being planted in more Bristol streets? Hopefully.

You will all have seen young trees planted in vacant tree pits in the streets of Bristol. These trees are replacement trees. There was once a tree growing there before – maybe some time ago.

These replacement trees are paid for by sponsorship, or by funds paid by Developers when they have felled trees on a building site and there is no room to replace the felled trees on the building site. In the latter case more than one tree has been “lost” – the one on the building site and the one that was previously in the tree pit.

In order to increase Bristol’s tree canopy – vital in this time of a climate emergency – we must see trees being planted in new places as well as getting all the “old” sites being filled more quickly.


Trees for Streets

To try to get this initiative going, Bristol has joined Trees for Streets.

Quotes from the Flyer for Trees for Streets

‘Bristol City Council has joined the Trees for Streets national street tree sponsorship scheme, which aims to plant thousands of additional trees in streets and parks across the city, by supplementing the council’s tree budgets through public and corporate sponsorship.’

and

‘Trees for Streets is the National Street Tree Sponsorship Scheme from the urban tree charity Trees for Cities, funded by the government’s Green Recovery Challenge Fund and City Bridge Trust. The project uses technology to empower people and makes it easy for residents and organisations to get involved in greening their communities.’

and

‘Our mission is to fund the planting of more than 250,000 additional street trees nationwide over the next ten years by hosting online tree sponsorship schemes on behalf of local councils and delivering local promotion and engagement activity to bring these schemes to life.’

Comment

Bristol has long had a Tree Sponsorship scheme, run by TreeBristol (part of Bristol City Council).

In the 2021/2022 planting season £456,000 was spent by Bristol Council in planting of trees. A portion of this money is retained by BCC for maintaining the trees planted 55% of this money came from mitigation funds paid by Developers who had felled trees somewhere in the city in order to build on the land released. (So, the money was not being spent on NEW trees, just on replacements).

10% of that money came from sponsorship, with 6.5% coming from private sponsorship (individuals and groups) and 3.5% coming from business sponsorship. Even then a lot of that money was spent on replacing trees which had been lost i.e., not on providing trees in new sites. It is a difficult “sum” to achieve. Money from Developers is for the replacement of trees lost to development. The Bristol Tree Replacement Standard achieves an amount for replacement trees based on the size of the trees lost. Eventually the trees may grow to a size which more than compensates for the environmental value of trees lost. But it remains true that each replacement tree goes in to a tree site that has lost a tree formerly growing there – so the Council is spared the expense of replacing lost trees that it owned.

Representatives of the Bristol Tree Forum have attended two meetings now where this new scheme has been explained and described.

The Trees for Streets scheme is not going to fund the trees, nor plant the trees, so we would have worded the sentence “Our mission is to fund the planting of more than 250,000 additional street trees…….” slightly differently with instead “Our mission is to facilitate and organise the funding of the planting of more than 250,000 additional street trees…”

The Trees for Streets scheme is similar to Bristol’s former scheme in that it will provide a web based choosing and ordering and paying for system, whereby residents and organisations and businesses can find available tree sites for planting trees in Streets and Parks.

There are differences between the Trees for Streets Scheme and Bristol’s former scheme, and they are:

  • Bristol’s former sponsorship scheme was largely one of replacement for trees lost. A sponsor (an individual, a group or a business) would select, from the Council’s mapping, a site where formerly there had been a tree, and would pay for its planting. New site planting came from One Tree per Child (whips) or from national grants where Bristol would win a bid for a grant and spend the money.
  • The new scheme hopes to facilitate, through sponsorship, the planting of a new tree in a new site. These sites have to be found, and checked for Services (underground utility provision), and then put forward in the Council mapping for planting with a tree.
  • Residents, and other types of sponsor, will be able to suggest new sites for trees by answering the question “Where would you like to see a tree planted?” with their own suggestions.
    The sponsor would need to pay for the tree, but Trees for Streets might be able to assist with organising the funding, using their funding know how.
  • Initially this kind of new planting of Street Trees will only be possible in streets that currently have green verges, or in new sites in Parks.
  • (Trees in “hard ground” – pavements, plazas, city squares, etc. will need to be planted in engineered tree pits – and that is expensive. If a sponsor (which can be an individual, a group or a business) is prepared to meet that cost, then efforts will be made to agree suitable sites and then check them for Services and other criteria, such as the width of the pavement.)
  • Trees for Streets has national funding and this gives it an improved platform with web support and advertising which could see many more trees sponsored. Maybe businesses reached by the advertising will see a role in supporting tree planting in the more “tree poor” areas of Bristol?
  • Bristol is to offer residents the option to water their sponsored tree when it is outside their property – at a reduced cost (£160/tree v £295/tree).  It gives people an option at a lower cost – and it avoids trucks driving about with lots of water in a bowser.  It has worked elsewhere, and Bristol is going to try it.
  • DEFRA has provided funds for the setting up of Trees for Streets, and maybe future DEFRA grants will be channelled through this new national scheme. Bristol has, by making individual bids, obtained grants for tree planting from DEFRA in the past, and will still want to continue to make these bids for new funding for the actual purchase and planting of trees for new sites.

How it will work:

  1. Go to the Trees for Streets website at https://treesforstreets.org.bristol.
  2. Choose the location of your tree from the map or suggest a spot in a grass verge in your street or neighbourhood. The questions on the website take you through the choices.
  3. Answer a few questions about the location and you.
  4. If all works out your tree will be planted during the next available planting season.

Bristol Tree Forum’s Tree Champions are to be offered training from Bristol’s Tree Officers so that they can help residents, organisations and businesses with determining the suitability of sites that are suggested.

Valuing our urban trees – part III

When is tree not a tree?

Figure 1  Leyland cypress trees on the boundary of the former Police Dog & Horse Training Centre, Bristol.

The Biodiversity Metric 3.0 (BNG 3.0) User Guide defines Urban Tree habitats as follows:

Individual TreesYoung trees over 75mm in diameter measured at 1.5m from ground level and individual semi-mature and mature trees of significant stature and size that dominant their surroundings whose canopies are not touching but that are in close proximity to other trees.
Perimeter BlocksGroups or stands of trees within and around boundaries of land, former field boundary trees incorporated into developments, individual trees whose canopies overlap continuously.
Linear BlocksLines of trees along streets, highways, railways and canals whose canopies overlap continuously.

These habitats are measured by area (hectares). Using this measurement and other parameters (Distinctiveness, Condition and Strategic Significance), their baseline biodiversity value is calculated in area biodiversity habitat units (ABHUs).

BNG 3.0 also includes separate calculations for two types of linear habitat, one of which is ‘Hedgerows and Lines of Trees’. These linear habitats are measured in kilometres. Using this measurement and the same parameters used for ABHUs, their baseline biodiversity value is calculated in hedgerow biodiversity units (HBUs).

Hedgerow habitats are a feature almost unique to the British Isles, but ‘Lines of Trees’ have been included as a linear habitat as they ‘display some of the same functional qualities as hedgerows’.

Box 8-2 of the BNG 3.0 User Guide (Figure 2) uses this key to help identify Hedgerow or Line of Trees habitat types:

Figure 2 Box 8.2 – BNG 3.0 User Guide

The BNG 3.0 User Guide states that ‘Urban trees are considered separately to lines of trees in the wider environment, since they generally occur in an urban environment surrounded by developed land’. However, it is possible for disagreements to arise where the site is not clearly part of ‘an urban environment’, even though the trees fall within the Urban Tree habitat definition as either Perimeter or Linear Blocks.

A recent example demonstrates the issue. It involved 34 Leyland cypress trees growing along the boundary of the former Police Dog & Horse Training Centre on Clanage Road, Bristol, on the edge of the city. These trees were planted to form a screen between Clanage Road and the training centre (Figures 1 & 3).

This issue was argued before the Planning Inspector when the Secretary of State called the matter in (APP/Z0116/V/21/3270776) following a grant of planning permission for a change of use to a touring caravan site.

It was agreed at the inquiry that these trees had been planted between 1.5 to 2 metres apart, had developed average stem diameters of 33 cm and had grown to about 10 metres high and eight metres wide. The whole row is about 72 metres (0.072 km) long.

Figure 3 The site on the edge of the city (red boundary line)

Using the flow chart at Box 8-2 above, the developer’s ecologist argued that these trees were a Hedge Ornamental Non-native habitat. So, using the BNG 3.0 calculator, they would be assessed as a linear habitat 0.072 kilometres long. This habitat is given a Very Low Distinctiveness (score 1) and has a Poor Condition (score 1) [1]. Because of its location, it was given a Strategic Significance of Within area formally identified in local strategy (score 1.15). As such, the baseline habitat value is calculated as 0.072 x 1 x 1 x 1.15 = 0.08 HBUs.

We argued that these trees formed an Urban Tree habitat and that, using the BNG 3.0 calculator, it should be treated as 34 Medium-sized trees with a combined area of 0.1384 hectares with a Medium Distinctiveness (score 4) and is in Poor Condition (score 1) – even though it was agreed that the trees were in good condition and could be categorised as B2 using BS 5837:2012. Because of its location, it was given a Strategic Significance of Within area formally identified in local strategy (score 1.15). On this basis, the baseline habitat value is calculated as 0.1384 x 4 x 1 x 1.15 = 0.64 ABHUs (nearly 8 times the HBU value).

Whilst Rule 4 of the BNG 3.0 User Guide (page 37) states that ‘… the three types of biodiversity units generated by this metric (for area, hedgerow and river habitats) are unique and cannot be summed’, it is clear that adopting either of these two approaches will result in very different outcomes when assessing biodiversity net gain.

In our view it is vital not to undervalue baseline habitats by the selective use of the habitat definitions given in BNG 3.0.

The planning inquiry decision (refusal) has now been published – APP/Z0116/V/21/3270776.

A copy of this blog is available here.


Valuing our urban trees – part I

Valuing our urban trees – part II


[1] The Very Low Distinctiveness and Poor Condition parameters are the only options available for this habitat type under BNG 3.0.

Valuing our urban trees – part II

Assessing the condition of urban tree habitats using Biodiversity Metric 3.0

Our recent blog – Valuing our urban trees I, pointed out the failings of the methodology for calculating the size of urban tree habitats as set out in Biodiversity Metric 3.0 (BNG 3.0). We would now like to show how this is compounded by the inappropriate assessment criteria used to determine the condition of Urban Tree habitats, as also set out in BNG 3.0 (see Annex 1).

We use the following example – taken from a recently approved planning application [1] which will result in the removal of 13 urban trees – to demonstrate why this is approach is inappropriate.

Figure 1 The example tree – Google Street View 2020

This street tree is a London Plane (Platanus × acerifolia) with a stem diameter (called DBH) of 118 cm. It is a non-native species planted in hard standing on Bridge St, Bristol BS1 2AN in about 1967. Using BS 5837:2012 – Trees in relation to design, demolition and construction – Recommendations (a BSI Standards Publication), it has been categorised as A,1,2 (see Annex 2). The developer’s Arboriculturalist described it as having a ‘Large, broad crown with excellent form and vigour.’

The tree’s BS 5837:2012-calculated Root Protection Area (RPA) radius[3] is 14.6 metres, so it has an RPA of 630 square metres. The tree has an average crown radius of 9.88 metres and a calculated canopy area of 306 square metres.

Using BNG 3.0 TABLE 7-2: Urban tree size by girth and their area equivalent (see Annex 1), the calculated RPA of the tree is set at Large, so its habitat size is limited to just 113 square metres – a discount of 82% of its calculated RPA and 37% of its canopy area.

Notwithstanding categorisation of the tree as A,1,2, the BNG 3.0 Condition Assessment Criteria categorises the condition of this tree as Poor because it meets only two of the six criteria, as shown below:

Using BNG 3.0, the calculation of the baseline habitat (called Habitat Units) of this tree is as follows:

Had the BS 5837:2012 condition of the tree been allowed for and its condition set to ‘Good’, then the habitat units of this tree would be three times the habitat unit value of 0.0452, i.e., 0.1356 as shown below.

Not only has the true size of the urban tree habitat been significantly undervalued (because its actual RPA has not been used), but its assessed condition using the BNG 3.0 criteria is also clearly inappropriate given that this tree has been assessed at the highest category under BS 5837:2012:

Category A – Trees of high quality with an estimated remaining life expectancy of at least 40 years …that are particularly good examples of their species, especially if rare or unusual; or those that are essential components of groups or formal or semi-formal arboricultural features (e.g., the dominant and/or principal trees within an avenue).

The proposed solution

BNG 3.0 is seriously flawed when it comes to evaluating Urban Tree habitats. We have already commented on this when it comes to calculating habitat size.

In our view, the solution to the issue of assessing the correct condition of urban tree habitats is already available in BS 5837:2012. The standard may require some amendment to align it with BNG 3.0, but it is a well-established and practical approach used by the arboricultural community. This British Standard gives recommendations and guidance on the relationship between trees and design, demolition and construction processes and is used whether or not planning permission is required.

A copy of this blog can be downloaded here.


Our third blog dealing with habitat selection is available here – Valuing our urban trees – part III.


Annex 1

The Biodiversity Metric 3.0 – auditing and accounting for biodiversity

USER GUIDE (page 68)

TECHNICAL SUPPLEMENT (pages 193-194)


Annex 2

BS5837:2012 – 4.5 Tree categorization method – tree category definitions


[1] The Developer used BNG 2.0 in its submissions and applied a different Condition assessment to the one used here.

Bristol Tree Forum Annual General Meeting

Bristol Tree Forum
Annual General Meeting
Bristol City Hall
6 December 2021
18:30 – 20:00

Draft Agenda (may be modified nearer the date)
Bristol Tree Forum – bristoltreeforum.org – 6 December 2021

  1. Update from Mark Ashdown (Chair)
  2. Treasurer’s Report (John Tarlton)
  3. Election of Officers
  4. Message from Marvin Rees, Bristol Mayor
  5. BCC Communities Scrutiny Working Group – Trees (Councillor Martin
    Fodor)
  6. Tree planting & maintenance update (Richard Ennion)
  7. Tree Champions (Jim Smith)
  8. Any other business

Baltic Wharf Caravan Park: a controversial planning proposal

We have never been able to understand why Bristol City Council decided to terminate the lease of the longstanding and very successful central Bristol caravan site. It is not a brownfield site crying out for redevelopment, as some would have us believe. Its success and the 91 mature, well-established trees that grace it (74 of which are to be removed) testify to that.

Bristol Chamber of Commerce has described this caravan park as ‘… an important, high performing asset for Bristol’s visitor economy, enabling visitors to stay in walking distance of the city centre and thus providing significant levels of custom for local businesses‘.

And John Hirst, as Chief Executive of Destination Bristol, observed that ‘There are significant financial benefits for Bristol due to the year round supply of visitors to their current caravan site. We know that the current Bristol site at Baltic Wharf has been one of the most popular and successful central sites in the UK’.

So why on earth close the caravan park for a plan that almost nobody really wants – at least 273 at the last count? It seems that it’s worth closing this successful tourist attraction to replace it with new housing, even though the caravan park is estimated to bring some £1 to £1.5 million annually to Bristol’s tourist economy. The scramble for new housing at any cost – while ignoring the wishes of local communities and the economic benefits that the caravan park brings us – seems to take priority over all else.

And the result? We have proposals that will flatten every inconvenient tree rather than incorporating them into the proposed development. This only adds to the steady loss of green spaces and reduces Bristol, especially the centre of Bristol, to a grim, unliveable environment.  As Bristol grows hotter with each passing year, with the expectation that by 2050 life-threatening heatwaves will occur once every two years (not to mention the increasing flood risk to this area), we will need the cooling benefit of large, mature trees yet, tree by tree, they are inexorably removed in order to maximise profit and achieve what many say is an unrealisable aspiration. With the majority of new housing being sold at full market price, these will be as much for the benefit of the estimated 1,900 annual migrants from London as they are for the more affluent citizens of Bristol.

It is especially sad that Goram Homes, the much-lauded development arm of Bristol City Council, continues to ignore our very own key green planning policy, BCS9, and the revised National Planning Policy Framework (the Framework) upon which it is based. BCS9 states that ‘Individual green assets should be retained wherever possible and integrated into new development’.

The Framework is the foundation upon which BCS9 is based:

We had hoped that Goram Homes would have set a good example – especially since the Council has recently published its Ecological Emergency Action Plan and announced that it will “embed nature into all decisions” – and abide by these important principles. What has happened to the Framework’s third, overarching environmental objective? Taking Baltic Wharf Caravan Park as an example, it would have been quite straightforward to design any new housing around existing trees, particularly if the focus was on just building affordable and social housing. Instead, nearly all are going. This, it seems, is ‘Placeshaping’, Bristol-style.

And this intransigence has resulted in damaging national press coverage – though note the lovely photo of the trees growing on the site.

Our objections to the proposals are set out here, but we are not the only ones…

Councillor Mark Wright’s experience

Councillor Mark Wright was the councillor for Hotwells and Harbourside until May 2021 when he stepped down.  Here he presents his experience of the many attempts he made to engage with the planners and Goram Homes at an early stage to try to secure as good an outcome as possible given that the caravan park was doomed to be closed. They came to nothing.

Mark writes:

‘Sept 2018

Mayor Rees announces that flats will be built on the site.

Dec 2018

I wrote to Cllr Paul Smith (Housing) “There are a number of very nice trees on the caravan park site that residents are already calling for saving (see attached Google 3D image). If done skilfully and at an early enough stage, many of the best trees could be embraced into the development in a way that greatly increases the value of the retail flats. If done too late or not at all, it’s likely that getting planning permission will become a battle over trees, which isn’t what anyone really wants. I think it would be a good demonstration of why Goram is a good thing if it sets the bar high on pre-app planning on things like this – it could really set an example to other developers. I understand that planning policy BCS9 requires the developer (i.e., BCC in this case) to do a tree constraints plan as early as possible – there is no need to wait until the actual plans start to form to do this. Can we get BCC to start this ASAP?” Cllr Smith replied, “I will have a word with officers”, but I got no further response.

I also wrote to the Council’s Arboricultural Officer, Matthew Bennett, asking for a tree assessment report to be done ASAP so that the best trees on the site could be saved and incorporated into the plans. I was interested in getting TPOs put on the best trees, but at that early stage Bennet replied to me: “Our aim through the planning process is to secure the best trees on site and mitigate the loss of those removed through the planning obligations SPD (BTRS). We cannot try and save every tree {…} a tree preservation order would not help the situation because full planning consent overrides a TPO”. That seemed reasonable so I concentrated on trying to get a tree report.

Jan 2019

I contacted officers again for an update but got no info.

Early Feb 2019

Planning Officer Paul Chick told me that no arboricultural tree report would be done until a pre-app was submitted, but no one knew when that would be.

Late Feb 2019

I raised the issue of trees on the site with Cllr Paul Smith and Steve Blake at Goram (Development manager); Cllr Smith said he had raised the issue of trees after my earlier contact, but I heard nothing more.

Jun 2019

I again raised the issue of trees on the site with Steve Blake at Goram and Matthew Bennett but got no response.

July 2019

A tree report was secretly written for the Council, but I wouldn’t see it until December 2020.

Dec 2019

The first concept images of the plans were released to the public. I wrote to Steve, Matthew, and Paul Smith again: “I note with interest the Council’s press release today indicating that a development partner has been selected for this housing site. There is even a picture of the proposed build. I presume this *must* mean that there has been enough preliminary work done to allow a tree constraints report for the site to be drawn up. Please can you assure me that the prime trees currently on the site are being designed into this new plan? A development such as this will be greatly enhanced in value by the intelligent and thoughtful retention of mature trees, and the Council’s reputation as a builder will be greatly enhanced as well, setting a higher bar in the city for other developers to follow…”

I got no responses…

Jan 2020

I wrote to Tim Bluff, a new contact at Goran Homes (taking over from Steve Blake, presumably) I had been given after badgering people. Bluff informed me that a tree report had in fact been done 6 months previously. I had never been told about it, despite asking multiple people for it for 13 months. I was told at this point the document wasn’t public and I couldn’t see it.

Feb 2020

There was a public *showing* of the plans. At this point it was clear that the plans were essentially almost “final” despite there having not been a single public engagement session of any kind, about anything. I declared publicly that I was concerned about both height and loss of trees.

Mar 2020

I discussed with the Bristol Tree Forum doing an informal assessment of the trees, but the Covid lock-down squashed that.

Apr 2020

The pre-app was published privately on the planning portal, but I couldn’t have access.

Early May 2020

The pre-app was made available to me, but not the public. It was clear that all trees on the site would be felled; all that would be saved was some of the boundary hedges. Again, by this point there had still been zero public engagement on any issue, only a showing of the images. The 10-month old Arboricultural report (i.e., July 2019) was still not available to anyone, including the Council’s own Arboricultural officer Matt Bennett, who wanted it too.

Late May 2020

I had a video meeting with Stephen Baker, Development manager at Goram (and Geoff Fox and Glynn Mutton) to discuss the plans. I made it clear I was unhappy with the height, the loss of all trees was a major problem, and the lack of any public input before publishing the plans was a big mistake and contrary to planning requirements on major plans. Steve said the trees were all being lost because the site had to be raised 2m to allow “active frontages” that comply with planning regs. I said that saving trees might be preferable to active frontages inside the site; I asked him who made this critical decision and when, as this was exactly the kind of thing the public should have fed into – at least if the decision had been informed by the public there would be some buy-in. He said he didn’t know and it had all happened before he joined the project. I made clear I was disappointed, but I really didn’t want to end up opposing the plans, and I hoped there would be a reduction in the height.

Oct 2020

Website for the plans went up.

Dec 2020

I finally received a copy of the July 2019 tree report – from the Bristol Tree Forum, not from the Council! It was clear that the decision to fell all trees on site had already been made earlier than July 2019.

Apr 2021

Full Planning app submitted, with no real changes since the pre-application stage. I lodged an objection “with heavy heart”.’

Bristol Tree Forum tree planting campaign – free Oak saplings available for planting

STOP PRESS

We delighted to report that nearly 1,600 tree orders have been received. We have bought another 600 trees to cover the extra orders and expect delivery soon.

Many thanks to all of you who have placed an order. We shall soon let you know when and where you can collect your trees.

Due to COVID-19 restrictions and delays in government funding, there has been postponements and cancellations of many major tree planting projects. As a result, large numbers of tree saplings are due for destruction in tree nurseries. This includes 750,000 two year old English oak tree saplings at the Maelor Forest Nursery in Wrexham.

Rather than see these trees destroyed, Bristol Tree Forum has purchased 1,000 of the oak saplings for free distribution to anyone able to plant them, whether this is one tree or a hundred.

We will get delivery early in November. The trees can be collected from a site in Redland, Bristol and a few collection dates will be organised hopefully to suit all. They should be planted as soon as possible afterwards.

The saplings are between 10cm and 90cm high. They come bare-rooted (i.e. out of the soil) and need to be planted as soon as possible after collection, although the viability of the trees over winter can be extended a little by storing the trees with the roots covered in damp soil.

This form is to find out who would like to have saplings for planting and how many, and for you to provide basic contact details (email and/or phone number) for us to organise collection of the trees. Contact details will not be used for any other purpose.

Why plant a tree?

A single mature oak tree is the equivalent of 18 tonnes of CO2 or 16 passenger return transatlantic flights.

Despite advances in carbon capture technology, the most efficient and cost-effective way to sequester carbon from the atmosphere is to plant trees.

Recent scientific reports calculate that planting trees wherever we can, without occupying land used for other purposes, would absorb up to two thirds of the carbon emitted in the last century.

Oak trees can support over 2300 different species, including birds, mammals, invertebrates, mosses, lichen and fungi.

Trees improve air quality by absorbing both gaseous (e.g. NO2) and particulate pollution.

Trees reduce traffic noise and flooding, reduce excessive heat in cities and improve physical and mental wellbeing.